Difference between revisions of "Retrofit Instructions"

From re:3D
Jump to: navigation, search
Line 1: Line 1:
  
 
'''Customers who have purchased the full Gigabot 2 to Gigabot 3 retrofit, please follow these manuals below to complete your installation:'''
 
'''Customers who have purchased the full Gigabot 2 to Gigabot 3 retrofit, please follow these manuals below to complete your installation:'''
* Side Panel Installation
 
* Filament Detection Installation
 
* Power and Z Limit Switch Relocation
 
 
* Gigabot Trolley and Cable Carrier Upgrade
 
* Gigabot Trolley and Cable Carrier Upgrade
 
+
* Power and Z Limit Switch Relocation
 +
* Filament Detection Installation
 +
* Side Panel Installation
  
  

Revision as of 14:41, 1 January 2016

Customers who have purchased the full Gigabot 2 to Gigabot 3 retrofit, please follow these manuals below to complete your installation:

  • Gigabot Trolley and Cable Carrier Upgrade
  • Power and Z Limit Switch Relocation
  • Filament Detection Installation
  • Side Panel Installation


Wiring diagrams as well as running edit logs for the instructions are linked to at the bottom of this page




Filament detection manual.jpg
GB3 trolley and Cable carrier manual.jpg


Wheeled Platform Manual.jpg
Viki 2 Manual.jpg


Tablet Holder Manual.jpg
Side Panel Manual.jpg


Viki manual.jpg
GB2 Cable carrier manual.jpg


Power and Z limit switch manual.jpg

GB2 and GB3 Wheeled Platforms Wheeled Platform













Gigabot Wiring Diagrams

Viki 1.0 and Azteeg 1.0

Viki 2.0 and Azteeg 1.2

Viki 2.0 and Azteeg 2.0

Filament Detection


See the visual below to determine your Azteeg version:

Azteeg Differences -515403-.jpg















Retrofit Instruction Edit Logs

Filament Detection edit log