Customers who have purchased the full Gigabot 2 to Gigabot 3 retrofit, please follow these manuals below to complete your installation:

  • Side Panel Installation
  • Filament Detection Installation
  • Power and Z Limit Switch Relocation
  • Gigabot Trolley and Cable Carrier Upgrade


Wiring diagrams are linked to at the bottom of this page




Filament detection manual.jpg
GB3 trolley and Cable carrier manual.jpg


Wheeled Platform Manual.jpg
Viki 2 Manual.jpg


Tablet Holder Manual.jpg
Side Panel Manual.jpg


Viki manual.jpg
GB2 Cable carrier manual.jpg


Power and Z limit switch manual.jpg

GB2 and GB3 Wheeled Platforms Wheeled Platform


Gigabot Wiring Diagrams

Viki 1.0 and Azteeg 1.0

Viki 2.0 and Azteeg 1.2

Viki 2.0 and Azteeg 2.0

Filament Detection

Note: The Filament Detection diagram shows red and black limit switch wires, but the actual wires are white and black. Until this diagram is updated, please interchange red with white.

See the visual below to determine your Azteeg version:

Azteeg Differences -515403-.jpg