Difference between revisions of "Retrofit Instructions"

From re:3D
Jump to: navigation, search
Line 16: Line 16:
 
----
 
----
  
 +
 +
[[Image:GB3+_leveling_retro.png|thumb|none|top|500px|link=http://wiki.re3d.org/images/9/9e/GB3%2B_Leveling_Block_Retrofit_Rev01.pdf]]
  
  

Revision as of 16:02, 27 January 2017

Customers who have purchased the full Gigabot 2 to Gigabot 3 retrofit, please follow these manuals below in this order to complete your installation:

You can follow along with our playlist of GB2 to GB3 retrofit videos

  • Gigabot Trolley and Cable Carrier Upgrade
  • Power and Z Limit Switch Relocation
  • Viki 2.0 Installation
  • Viki LCD Holder Installation
  • Filament Detection Installation
  • Side Panel Installation

Wiring diagrams and edit logs for all instruction manuals are found at the bottom of this page




GB3+ leveling retro.png


Filament detection manual.jpg
GB3 trolley and Cable carrier manual.jpg


Wheeled Platform Manual.jpg
Viki 2 Manual.jpg


Tablet Holder Manual.jpg
Side Panel Manual.jpg


Viki manual.jpg
GB2 Cable carrier manual.jpg


Power and Z limit switch manual.jpg

GB2 and GB3 Wheeled Platforms Wheeled Platform













Gigabot Wiring Diagrams

Viki 1.0 and Azteeg 1.0

Viki 2.0 and Azteeg 1.2

Viki 2.0 and Azteeg 2.0

Filament Detection


See the visual below to determine your Azteeg version:

Azteeg Differences -515403-.jpg

Retrofit Instruction Edit Logs

Filament Detection edit log