Difference between revisions of "Retrofit Instructions"

From re:3D
Jump to: navigation, search
Line 5: Line 5:
 
* Power and Z Limit Switch Relocation
 
* Power and Z Limit Switch Relocation
 
* Gigabot Trolley and Cable Carrier Upgrade
 
* Gigabot Trolley and Cable Carrier Upgrade
 +
 +
 +
 +
'''Wiring diagrams are linked to at the bottom of this page'''
  
  

Revision as of 20:52, 12 November 2015

Customers who have purchased the full Gigabot 2 to Gigabot 3 retrofit, please follow these manuals below to complete your installation:

  • Side Panel Installation
  • Filament Detection Installation
  • Power and Z Limit Switch Relocation
  • Gigabot Trolley and Cable Carrier Upgrade


Wiring diagrams are linked to at the bottom of this page




Filament detection manual.jpg
GB3 trolley and Cable carrier manual.jpg


Wheeled Platform Manual.jpg
Viki 2 Manual.jpg


Tablet Holder Manual.jpg
Side Panel Manual.jpg


Viki manual.jpg
GB2 Cable carrier manual.jpg


Power and Z limit switch manual.jpg

Gigabot Wiring Diagrams

Viki 1.0 and Azteeg 1.0

Viki 2.0 and Azteeg 1.2

Viki 2.0 and Azteeg 2.0

Filament Detection

GB2 Wheeled Platform Wheeled Platform